Completed Projects
Completed Spring 2023
- 1 Washington Mews, Ireland House
NYU completed facade and roof repairs at 1 Washington Mews. The project began in mid-August 2022 and was completed in January 2023. - 421 First Avenue, Weissman Hall
NYU completed standard Local Law 11 repairs at 421 First Avenue. The project began in October 2022 and was completed in spring 2023.
Completed Winter 2022
- 5 University Place
NYU completed standard Local Law 11 repairs at 5 University Place. The project began in August 2022 and was completed in winter 2022. - 244-246 Greene Street
NYU completed installing Hot Temperature Hot Water at 244-246 Greene Street. The project began in September 2022 and was completed in winter 2022. - 21 Washington Place
NYU completed standard Local Law 11 repairs at 21 Washington Place. This project began in August 2022 and was completed winter 2022. - John A. Paulson Center
NYU completed the John A. Paulson Center at 181 Mercer Street. The project began in October 2016 and was completed in winter 2022.
Completed Fall 2022
- 28 Waverly Place
NYU completed standard Local Law 11 repairs. The project began in September 2022 and was completed in fall 2022. - 1 East 78th Street
NYU completed renovations at 1 East 78th Street. This project began in April 2022 and was completed spring 2022
Completed Spring 2022
- 25 Union Square West
NYU completed renovations at 25 Union Square West. This project began in August 2022 and was completed spring 2022.
- 23 Washington Place
NYU completed sidewalk vault repairs at 23 Washington Place. The project began in July 2021 and was completed in spring 2022. - 35 West 4th Street
NYU completed standard Local Law 11 repairs. The project began in August 2019 and was completed in spring 2022.
Completed Winter 2022
- Co-Generation Plant Upgrades
NYU completed upgrades to the Co-Generation Power Plant to accommodate increased electricity, heating, and cooling services for greater energy efficiency at 181 Mercer Street. - 18 East 8th Street
NYU completed facade repairs at 18-20 East 8th Street. The project began in August 2021 and was completed in winter 2021.
- 404 Lafayette Street
NYU completed interior renovations at 404 Lafayette Street. The project began in January 2018 and was completed in winter 2022. - 110 West 3rd Street, D'Agostino Hall
NYU completed standard Local Law 11 repairs to the facade of D'Agostino Hall at 110 West 3rd Street. The project began in mid-September 2021 and was completed in January 2022.
Completed Fall 2021
- 15 Washington Place
NYU completed standard Local Law 11 repairs. The project began in July 2021 and was completed in late summer 2021. - 19 West 4th
NYU completed standard Local Law 11 repairs. The project began in July 2021 and was completed in fall 2021. - 269 Greene Street
NYU completed facade repairs. The project began in October 2021 and was completed in fall 2021. - 70 Washington Square South
NYU completed a sidewalk restoration project which started in June and was completed in late summer 2021.
- 75 Third Avenue
NYU completed a window replacement project which started in April and was completed in late summer 2021.
- 370 Jay Street
NYU completed renovations on the long-dormant, City-owned 370 Jay Street in Downtown Brooklyn. The project began in winter 2014.
Completed Spring 2021
- 20 Cooper Square
NYU completed a sidewalk restoration project at 20 Cooper Square. The project began in spring 2020 and was completed in spring 2021.
- 50-53 Washington Square South, King Juan Carlos
NYU completed a sidewalk restoration project at the King Juan Carlos Center. The project began in April 2021 and was completed in May 2021.
Completed Fall 2020
- 33 Washington Square West, Lipton Hall
NYU performed standard Local Law 11 repairs to the facade of Lipton Hall, located at 33 Washington Square West. The project began in March 2019 and was completed in September 2020. - 726 Broadway
NYU performed standard Local Law 11 repairs to the facade of 726 Broadway. The project began in September 2019 and was completed in September 2020.
Completed Summer 2020
- 29 Washington Place, Brown Building
NYU performed standard Local Law 11 repairs to the facade of the Brown Building, located at 29 Washington Place. The project began in May 2020 and was completed in August 2020.
Completed Spring 2020
- 20 Cooper Square
NYU completed a LL11 project at 20 Cooper Square. The project began in March 2019 and continued until March 2020. - 31 West 4th Street
NYU completed a sidewalk vault repair project on Greene Street between West 4th Street and Washington Place. The project began in January 2020 and continued until March 2020.
Completed Winter 2019
- 1 East 78th Street, Duke House
NYU completed a sidewalk restoration project around the perimeter of Duke House at 1 East 78th Street. This project began in spring 2019 and continued through January 2020.
- 14 Washington Place, Local Law 11
NYU performed standard Local Law 11 repairs to the facade of 14 Washington Place. The project began in September 2019 and continued through December 2019. - 60 Fifth Avenue
NYU performed standard Local Law 11 repairs to the facade of 60 Fifth Avenue. The project began in October 2019 and continued through December 2019.
Completed Fall 2019
- 5 University Place, Weinstein Hall Roof Replacement
NYU replaced the roof of 5 University Place, Weinstein Hall. Work began in late October 2018 and continued through fall 2019.
- 51-53 Washington Square South, King Juan Carlos Center
NYU performed standard Local Law 11 repairs to the facade of the King Juan Carlos Center at 51-53 Washington Square South. The project began in the spring of 2018 and continued through fall 2019.
- Sidewalk and Vault Repairs
NYU performed repairs to the sidewalk vaults and sidewalks on the west side of Broadway between Waverly Place and West 4th Street, and on Waverly Place between Mercer Street and Broadway, and on Washington Place between Mercer and Greene Streets. The project began in March 2019 and continued through fall 2019.
Completed Summer 2019
- 6 MetroTech, Rogers Hall
NYU removed the existing mechanical tower between Rogers Hall and the Jacobs Building and built a new tower that will be used to consolidate and upgrade electrical infrastructure between the adjoining buildings. This project began in September 2017 and will continued until summer 2019. - 33 3rd Ave, Alumni Hall Sidewalk Restoration
New York University completed sidewalk restoration on select areas around the perimeter of Alumni Hall at 33 3rd Avenue. This project started in October 2018 and was completed in summer 2019. - 101 Johnson Street, Othmer Hall
New York University replaced the roof at Othmer Hall in Brooklyn. This included demolition of the existing roofing and installation of new materials. This project began in October and continued through summer 2019. - 110 East 14th Street, University Hall
NYU completed interior renovations and electrical upgrades at University Hall. The first phase began in May 2018 and continued through summer 2019. - 310 3rd Avenue, Gramercy Green
NYU performed standard Local Law 11 repairs to the facade of 310 3rd Avenue. The project began in April 2019 and continued through summer 2019.
Completed Summer 2019
- 6 MetroTech, Rogers Hall
NYU removed the existing mechanical tower between Rogers Hall and the Jacobs Building and built a new tower that will be used to consolidate and upgrade electrical infrastructure between the adjoining buildings. This project began in September 2017 and will continued until summer 2019. - 33 3rd Ave, Alumni Hall Sidewalk Restoration
New York University completed sidewalk restoration on select areas around the perimeter of Alumni Hall at 33 3rd Avenue. This project started in October 2018 and was completed in summer 2019. - 101 Johnson Street, Othmer Hall
New York University replaced the roof at Othmer Hall in Brooklyn. This included demolition of the existing roofing and installation of new materials. This project began in October and continued through summer 2019. - 110 East 14th Street, University Hall
NYU completed interior renovations and electrical upgrades at University Hall. The first phase began in May 2018 and continued through summer 2019
Completed Winter 2018
- 31 West 4th Street, Facade Repairs
New York University is performing standard repairs to the facade of 31 West 4th Street. This project began in March 2018 and ended in early 2019.
- 40 West 4th Street, Tisch Hall
New York University performed standard Local Law 11 repairs to the facade of Tisch Hall at 40 West 4th Street. The project began in mid-June and ended in early 2019.
- 70 Washington Square South, Bobst Library
New York University performed standard Local Law 11 repairs to the facade of Bobst Library at 70 Washington Square South. The project began in the summer of 2018 and ended in early 2019. - 120 East 12th Street, Founders Hall
New York University performed standard Local Law 11 repairs to the facade of Founders Hall at 120 East 12th Street. The project began in October 2017 and ended in early 2019.
- 245 Sullivan Street, Furman Hall
New York University performed standard Local Law 11 repairs to the facade of Furman Hall at 245 Sullivan Street. This project began in June 2018 and ended in early 2019.
- Washington Place High Temperature Hot Water Installation
NYU installed new high temperature and chilled water pipes between the East and Brown buildings on Washington Place. This project began in early April 2018 and continued to mid-March 2019. - Washington Square Village Elevator Replacement
NYU replaced the elevators in all four WSV buildings. The elevators will run more efficiently and cab interiors will be remodeled. The elevator replacement project began in June 2017 and continued until early 2019.
Completed Summer 2018
- 40 West 4th Street, Tisch Hall
NYU restored concrete parapet walls on the roof of Tisch Hall. This project began in June 2017 and ended in August 2017.
Completed Spring 2018
- 24 Waverly Place, Waverly Building
New York University performed standard Local Law 11 repairs to the facade of 24 Waverly Place. The project began in August 2017 and continued through May 2018.
- 25 Union Square West, Carlyle Hall
New York University repaired and replaced the roof of Carlyle Hall. This work included the removal of roof surfaces and the installation of new waterproofing and roofing materials. This project began in September 2017 and continued until May 2018.
- 25 West 4th Street
NYU renovated the first floor of 25 West 4th Street to create space for the NYU Welcome Center. The project began in November 2016 and continued until April 2018.
- 29 Washington Square West
New York University performed standard Local Law 11 repairs to the facade of 29 Washington Square West. The project began in early September 2018 and continued through March 2018.
Completed Winter 2017
- 60 Washington Square South, Kimmel Center
New York University performed standard Local Law 11 repairs to the facade of the Kimmel Center at 60 Washington Square South. The project began in September 2017 and continued through December 2017.
Completed Fall 2017
- 7 Washington Place, Window Replacement
NYU replaced 22 windows at 7 Washington Place. The project began in September 2017 and ended in October 2017. - 16 Washington Square Mews, French House
NYU renovated the French House on Washington Mews. This project began in June 2017 and continued until October 2017. - 33 Washington Square West, Lipton Hall
NYU performed maintenance on the roof and south facing wall of the Lipton Hall courtyard in order to address water leakage into the building and repair water damage to the building façade.
- 40 Washington Square South
NYU repaired sections of the sidewalk on MacDougal and Sullivan Streets between Washington Square South and West 3rd Street.
- 110 West 3rd Street, D'Agostino Hall
NYU repaired sections of the sidewalk on the south side of West 3rd Street between MacDougal Street and Sullivan Street.
- 110 East 14th Street, University Hall
NYU repaired sections of the sidewalk on the north side of East 13th Street between 3rd and 4th Avenue. The project began in June 2017 and continued until September 2017. - 126 East 14th Street, Palladium Hall
NYU repaired sections of the sidewalk on the north side of East 13th Street between 3rd and 4th Avenue. The project began in June 2017 and continued until September 2017.
Completed Summer 2017
- 58 West 10th Street
New York University is performing standard Local Law 11 repairs to the facade of 58 Wast 10th Street, Lillian Vernon House. The project began in May 2017 and continued until August 2017. - Temporary Boilers at Various Locations
NYU installed temporary boilers at multiple locations in order to complete critical, City-mandated maintenance to the University’s High Temperature Hot Water (HTHW) plant.
Completed Spring 2017
- Washington Square Village Roof Replacement and Local Law 11 Repairs
New York University performed standard Local Law 11 repairs to the facade of Washington Square Village. Concurrently, the University replaced the roofs of all four WSV buildings to address the frequent occurance of leaks. The project began in March 2015 and continued until May 2017.
Completed Winter 2016
- 110 East 14th Street
New York University performed standard Local Law 11 repairs to the facade of 110 East 14th Street. The project began in late May and continued until October. - 60 Fifth Avenue, Forbes Building Renovation
NYU renovated the Forbes building to create a modern, sustainable, academic center creating space for academic programs and classrooms. The project began in January of 2015 and continued until February of 2017. - 726 Broadway, Physics Lab Renovations
NYU renovated the 8th, 9th, and 10th floors of 726 Broadway which will be home to Physics labs. The project began in December of 2013 and continued until February of 2017.
Completed Fall 2016
- 6 MetroTech Roadway, Rogers Hall
NYU is completed internal renovations, infrastructure upgrades, and the installation of new windows at Rogers Hall. The project began in the fall of 2014 and continued until September of 2016. - 14 Washington Place, Leadership Initiative
New York University is renovated the former summer housing and credit union spaces on the first floor of 14 Washington Place to create office and meeting spaces. This project began in May 2016 and continued through November 2016.
- 31 Washington Place (100 Washington Square East), Silver Center for Arts and Sciences
NYU replaced the water tanks on the roof of the NYU Silver Center. This project began in June of 2016 and was completed in September of 2016.
- 33 Washington Square West, Lipton Hall
NYU replaced and repaired the interior roof on the second floor of Lipton Hall. This project began in mid-June of 2016 and was completed in September 2016. - 40 Washington Square South, Vanderbilt Hall
NYU repaired the facade of 40 Washington Square West, Vanderbilt Hall. The project began in early April and was completed in September 2016. - 75 Third Avenue, Third North Dormitory
New York University performed standard Local Law 11 repairs on the facade of 75 Third Avenue, Third North Dormitory. The project began in May of 2016 and was completed in September 2016. - 110 West Third Street, D'Agostino Hall
NYU replaced second floor setback roof and installed waterproofing at D'Agostino Hall. This project began in June of 2016 and was completed in September of 2016.
- 140 East 14th Street, Palladium Hall
New York University completed standard Local Law 11 repairs to the facade of 140 East 14th Street, Palladium Hall. The work began in late May 2016 and ended in September 2016.
- 285 Mercer Street
New York University completed standard Local Law 11 repairs on the facade of 285 Mercer Street. The project began in late May 2016 and ended in September 2016. - 383 Lafayette Street, Academic Space Center Renovation
NYU renovated the interior of 383 Lafayette Street to create a space for an academic and student support center. This project began in March of 2015 and ended in November of 2016.
- 404 Lafayette Street
NYU renovated the interior of 404 Lafayette Street to create a space for a new fitness center that will include strength and cardio training, as well as recreation classes. This project began in August of 2015 and ended in September of 2016.
- 421 First Avenue, Weissman Hall
New York University completed standard Local Law 11 repairs on the facade of 421 First Avenue, Weissman Hall. The project began in late May 2016 and ended in September 2016.
Completed Summer 2016
- 505 LaGuardia Place and Silver Towers, Heat and Hot Water Pipe Replacement
NYU replaced deteriorated heat and hot water pipes that connect 505 LaGuardia Place and Silver Towers. This project included internal abatement and construction work. The project began in April 2016 and ended in August 2016.
Completed Spring 2016
- 37 Washington Square West, Local Law 11 Facade Repairs
New York University performed standard Local Law 11 repairs on the facade of 37 Washington Square West. This project began in spring 2015 and ended in spring 2016. - 51-54 Washington Square South, King Juan Carlos I of Spain Center, Local Law 11 Facade Repairs
New York University performed standard Local Law 11 repairs to the facade of 51-54 Washington Square South. This project began in spring 2015 and ended in spring 2016. - 311 Bridge Street, Wunsch Hall Renovation
NYU renovated Wunsch Hall. The project included interior renovation and the replacement and repair of critical internal infrastructure. This project started in fall 2014 and ended in spring 2016. - LaGuardia Place Landscape
NYU worked with NYC Department of Parks and Recreation to upgrade the public open space along LaGuardia Place between Bleecker Street and West 3rd Street. Adrienne's Garden was not part of the project area. This project began in December 2015 and ended in April 2016. - Bleecker Street Landscape
NYU worked with the NYC Department of Parks and Recreation and NYC Department of Transportation to improve the planting areas on Bleecker Street between Mercer and LaGuardia. This project began in December 2015 and ended in April 2016.
Completed Winter 2015
- Silver Towers, Mercer-Houston Dog Run Relocation
NYU relocated dog run managed by the Mercer-Houston Dog Run Association (MHDRA) to the north side of Houston Street west of 181 Mercer Street (the Coles building). For more information about the Dog Run and membership options, visit mercerhoustondogrun.org.
- 100 and 110 Bleecker Street, Silver Towers Window and PTAC Replacements
NYU replaced single-paned windows with new double-paned windows. New PTAC (provide air conditioning and heating) units, insulation, and other sound-attenuating materials were installed in the existing metal cabinet covers in apartments. This project began in April 2015 and ended in February 2016.
- 101 Johnson Street, Othmer Hall Local Law 11 Repairs
NYU undertook standard Local Law 11 repairs to the facade of Othmer Hall. This project began in March 2015 and ended in November 2016.
- 7 East 12th Street, Local Law 11 Facade Repairs
New York University performed standard Local Law 11 repairs on the facade of 7 East 12th Street. This project began in May 2015 and ended in November 2015.
- 539, 541, and 545 LaGuardia Place, Retail Space Renovation
NYU is renovated three vacant stores in the LaGuardia Place retail strip. This project began in April 2015 and ended in December 2015. - Community Board 2 Office Exterior Repairs, 3WSV
NYU repaired the overhead canopy and exterior staircase of the Community Board 2 offices on LaGuardia Place. This project began in September 2014 and ended in December 2015.
Completed Fall 2015
- Washington Square Village Window Replacement
NYU replaced single-paned windows with new double-paned windows. New terrace doors, and insulation and sound-attenuating covers for built-in air conditioning units, were also installed in each apartment. This project began in September 2014 and ended in October 2015.
- 5 MetroTech, Dibner Hall, StudentLink
NYU StudentLink center opened its doors on the second floor of LC201. This project began in fall 2014 and ended in fall 2015.
- Rogers Hall, The Center for K12 STEM Education
NYU completed internal renovations for the Center for K12 STEM Education, which designs high quality programs for students in the STEM disciplines of Science, Technology, Engineering, and Mathematics. This project began in fall 2014 and ended in fall 2015. - Rogers Hall, Student Health Center
NYU completed internal renovations for the new Brooklyn satellite of NYU’s Student Health Center, which offers primary care and counseling services to NYU students in the borough. This project began in fall 2014 and ended in fall 2015. - Rogers Hall, Brooklyn Athletic Facility
New York University expanded the Brooklyn Athletic Facility at Rogers Hall with the addition of a new 4,360-square foot Physical Fitness Room.This project began in fall 2014 and ended in fall 2015. - 707 Broadway, Local Law 11 Facade Repairs
New York University performed standard Local Law 11 repairs to the facade of 707 Broadway. This project began in May 2015 and was completed in October 2015.
- 110 West 3rd Street
NYU renovated the dormitory spaces of D'Agostino Hall, updated the life safety systems, and replaced an existing water main pipe on West 3rd Street. This project began in May 2015 and ended in September 2015. - 14 Washington Place, Production Lab
New York University renovated the computer lab in the basement of 14 Washington Place to create a center where students and faculty can come together around film and film production. This project began in June 2015 and ended in September 2015. - 33 Washington Square West, Hayden Hall Dormitory Renovation and Local Law 11 Repairs
NYU renovated the dormitory spaces, building offices, common areas, and life safety systems at its Hayden Hall dormitory. For this project, NYU undertook Local Law 11 facade maintenance work and connected the building to the University's cogeneration plant. This project began in June 2014 and ended in September 2015. - 34 Stuyvesant Street Barney Building
New York University performed standard Local Law 11 repairs on the facade of 34 Stuyvesant Street. This project began in June 2015 and ended in September 2015.
Completed Summer 2015
Repairs and Upgrades
- 35 Fifth Avenue, Rubin Hall 1st Floor Renovation and Roof Replacements
NYU renovated new classroom spaces on the 1st floor, replaced the roof, and installed new rooftop mechanical equipment. This project began in April 2015 and ended in August 2015.
- 140 East 14th Street, Palladium Hall
NYU renovated the basement of Palladium Hall to create a new Varsity Athletic Suite. The project began in May 2015 and ended in August 2015.
- 80 Washington Square East, Goddard Hall Roof Replacement
NYU replaced the main and secondary bulkhead roofs of Goddard Hall. The project began in November 2014 and ended in June 2015. - 20 Cooper Square, Internal Renovation and Facade Work
New York University renovated the 1st and 2nd floors of 20 Cooper Square. This project included internal renovation, Local Law 11 facade work, window and shutter renewal, and the installation of a rooftop cooling tower. The project began in mid-September 2013 and ended in summer 2015. - 3-5 Washington Place Roof Repairs
NYU replaced the roof of 3-5 Washington Place. The project began in November 2014 and ended in August 2015.
No projects were completed in Spring of 2015.
Completed Winter 2015
Repairs and Upgrades
- 16 Washington Place, Leslie eLab Academic Space Conversion
New York University renovated the former retail space and surrounding sidewalk at 12-16 Washington Place to create a new entrepreneur's laboratory on the building’s first floor and basement level. The project began in February and continued through December 2014.
- 14 Washington Place, Courtyard Repairs
Water infiltrated the basement of 14 Washington Place through leaks in the surface of the courtyard, necessitating repairs. The project began in August 2014 and continued through January 2015. - 433 1st Avenue, Basic Science Building
As part of NYU's consolidation of medical programs along the 1st Avenue Health Corridor, the University redeveloped its property at 433 1st Avenue. Formerly home to the NYU's Basic Science complex, the revamped site is now a single, 170,000 square foot facility for the NYU College of Nursing, expanding facilities for the NYU College of Dentistry, and creating a space for the University's emerging bioengineering program. The project began in January 2012 and was completed in January 2015. - 24 Waverly Place and 100 Washington Square East
New York University renovated interior spaces at 24 Waverly Place and 100 Washington Square East to create a new contiguous area for the Department of Chemistry’s Computational Theory group. This project began in December 2013 and ended in January 2015. - 44 W 4th Street, Kaufman Management Center Terrace Roof Replacement
NYU made repairs required for the terrace roof at the Kaufman Management Center. The project began in July 2014 and ended by January 2015. - 5 University Place, Weinstein Hall Rooftop Bulkhead Repair
NYU repaired rooftop bulkheads on the east and west sides of Weinstein Hall. The project began in September 2014 and ended in January 2015.
Local Law 11 Facade Repairs
- 33 3rd Avenue, Third North Dormitory Local Law 11 Facade Repairs
NYU undertook standard Local Law 11 repairs to the facade of 33 Third Avenue, Alumni Hall. The project began in June 2014 and ended in February 2015. - 50 West 4th Street, Gould Center Local Law 11 Facade Repairs
NYU undertook standard Local Law 11 repairs to the facade of 50 W 4th Street. The project began in June 2014 and ended in December 2014. - 55 East 10th Street, Brittany Hall Dormitory Local Law 11 Facade Repairs
NYU undertook standard Local Law 11 repairs to the facade of 55 East 10th Street. The project began in June 2014 and ended in December 2014.
Completed Fall 2014
Repairs and Upgrades
- Sullivan Street Sidewalk Rehabilitation
NYU rehabilitated sections of the sidewalk surrounding Vanderbilt Hall and Furman Hall (245 Sullivan Street and 40 Washington Square South). The project started in June 2014 and continued through September 2014.
- Washington Square Village Water Tank Replacement
New rooftop water tanks were required at Washington Square Village buildings 1, 2, 3, and 4. The project began in April 2014 and was completed by October 2014.
Local Law 11 Facade Repairs
- 110 West 3rd Street, D'Agostino Hall
NYU undertook standard Local Law 11 repairs to the facade of 110 W 3rd Street, D'Agostino Hall. The project began in June 2014 and ended in early September 2014.
- 246 Greene Street
NYU undertook standard Local Law 11 repairs to the facade of 246 Greene Street. The project began in June 2014 and ended in September 2014.
Completed Summer 2014
Repairs and Upgrades
- 715-719 Broadway Roof Repairs
New York University replaced the roof of 715-719 Broadway. This project began in November 2013 and ended in January 2014. - Broadway Block Sidewalk Repairs
NYU repaired sections of the sidewalk on the north side of Washington Place and the south side of Waverly Place between Broadway and Mercer Street. This work was one segment of a multi-year project that target the perimeter of the academic block bound by Mercer Street, Washington Place, Broadway, and Waverly Place, called the "Broadway Block." The project started in June 2014 and continued through August 2014.
- Facade Repairs, 19 University Place
NYU undertook facade repairs at 19 University Place. The project began in June 2013, and ended in June, 2014.
- Deutsches Haus Maintenance, 42 Washington Place
NYU repaired and upgraded parts of its Deutsches Haus building. The project began in July 2014 and ended in September 2014.
Local Law 11 Facade Repairs
- Pless Hall, 32 Washington Place
NYU undertook standard Local Law 11 repairs to the facade of Pless Hall. The project began in June 2013 and ended in July 2014.
- Carlyle Court Dormitory, 25 Union Square West
NYU will be undertaking standard Local Law 11 repairs to the facade of 110 W 3rd Street. The project began in June 2014 and ended in September 2014.
- Economics Department, 269 Mercer Street
NYU undertook standard Local Law 11 repairs to the facade of 269 Mercer Street. The project began in September 2013 and ended by September 2014. - Kimball Hall, 246 Greene Street
NYU undertook standard Local Law 11 repairs for the facade of 246 Greene Street. The project began in June 2014 and ended in September 2014.
- Residential Properties, 18 Waverly Place
NYU undertook standard Local Law 11 repairs to the front and rear facades of 18 Waverly Place. The project began in June 2014 and ended in September 2014.
- Weinstein Hall, 5 University Place
NYU undertook standard Local Law 11 repairs to the facade of 5 University Place. The project began in June 2014 and ended in September 2014.
Completed Spring 2014
- Education Complex Renovation, W 4th St and Washington Square East
NYU completed a renovation to the Education Block, at Washington Square East and West 4th Street, which has improved facilities for the NYU Steinhardt School. The project will began in January 2013 and ended in March 2014.
- Washington Mews Facade Restorations, University between 8th and Waverly
Following NYU's renovation of the historic Mews streetscape, the University proceeded to restore many of the street's building facades. The project began in February 2013 and ended in April 2014.
- Sidewalk Restoration, LaGuardia Place
NYU repaired cracks and uneven sidewalks and asphalt in front of the LaGuardia Place retail spaces and on select areas of the sidewalk and curb closest to the street. The project began in March 2014 and ended in April 2014. - Local Law 11 Facade Repairs, 239 Greene Street
Local Law 11 repairs were required for the facade of 239 Greene Street. Construction began in November 2013 and ended by March 2013. - Campus Safety and Card Services Centers, 7 Washington Place
NYU completed a ground floor renovation of 7 Washington Place, which created a new home for the Card Services Center and a new command center for the Department of Campus Safety. The project began in November 2013 and ended in March 2014.
Completed Winter 2014
- Local Law 11 Facade Repairs, 726 Broadway
Local Law 11 repairs were required for the facade of 726 Broadway. The project began in June 2013 and ended in December 2013.
Completed Fall 2013
- Dental School Sidewalk Repair, 421 1st Avenue
Repairs were necessary for various curbs and sidewalks surrounding the New York University School of Dentistry. The project began in July 2013 and ended in September 2013.
- Sidewalk and Vault Repair, 3-5 Washington Place
This project targeted vaults and sidewalks on the southern half of Mercer Street and the western half of Washington Place. The project began in June 2013 and ended in September 2013.
- Sidewalk and Vault Repair, 245 Sullivan Street and 40 Washington Square South
NYU undertook repairs to the vaults and sidewalks at Furman Hall and assessed a future project at Vanderbilt Hall. The project began in August 2013 and ended in October 2013.
- Local Law 11 Facade Repairs, 28 Waverly Place
Local Law 11 repairs were required for the facade of the Waverly Building. The project began in June 2013 and ended in September 2013.
- Local Law 11 Facade Repairs, 247-251 Mercer Street
Local Law 11 repairs were required for the facade of Warren Weaver Hall. The project began in June 2013 and ended in September 2013.
- Sidewalk and Vault Repair, 33 Washington Square West
Selected concrete flags and steel curbing along Washington Place and Washington Square West required removal and replacement. The project began in June 2013 and ended in September 2013.
- Bobst Library Window Repairs, 70 Washington Square South
Critical window repairs were undertaken to prevent air and water leaks in Bobst Library. The project began in June 2013 and ended in September 2013.
- Barney Building Renovation, 34 Stuyvesant Street
The Department of Art and Art Professions building underwent renovations during the summer months, including upgrades to the Einstein Auditorium. The project began in June 2013 and ended in September 2013.
- Abu Dhabi House Renovation, 19 Washington Square North
NYU conducted facade repairs along the north and west sides of 19 Washington Square North, Abu Dhabi House. The project began in May 2013 and ended in September 2013. - Brittany Hall, East 10th Street
NYU conducted a full upgrade of Brittany Hall, including dormitory spaces, building offices, common areas, and life safety systems. The renovated Brittany Hall continues to house many of the University's upperclassman, now in more energy-efficient, modern spaces. The project began in December 2012 and ended in September 2013.
Completed Summer 2013
- Emergency Repairs at Vanderbilt Hall, 40 Washington Square South
In response to a steam pipe leak, NYU conducted emergency sidewalk work and installed temporary boilers outdoors at nearby locations. The project began and ended in August 2013.
Completed Spring 2013
- Window Replacements, 14 Washington Place
To improve quality of life in response to residents' requests, NYU replaced older windows at 14 Washington Place with modern, energy efficient windows that still matched the style of the older installations. The project began in December 2012 and ended in March 2013.
- East Building Roofing, 239 Greene Street
A maintenance project was needed to replace the roof of 239 Greene Street, NYU's East Building. The project began in November 2013 and ended in March 2013.
Completed Winter 2013
- English Department Renovation, 244 Greene Street
A renovation of 244 Greene Street created a new home for the NYU English Department. The project began in November 2012 and ended in February 2013.
Contact
Monday through Friday, 9:00 am - 5:00 pm, contact NYU Community Engagement at community.engagement@nyu.edu or 212-998-2400. Outside those hours, contact the NYU Client Services Center NYU Client Services Center at contactcsc@nyu.edu and 212-998-1001. For questions regarding NYU Langone Medical Center's construction projects, please contact the Real Estate Development Office at NYU Langone.
Email Updates
If you would like to receive updates about NYU construction projects in your neighborhood, join the list to receive word if a construction project happens nearby.