Overview

New York University is performing standard Local Law 11 repairs to the facade of 726 Broadway and 418 Lafayette Street. The project is scheduled to begin in early September and continue through December. All work is weather and site conditions permitting.

Work Hours

Monday - Friday
8:00 am - 5:00 pm

Current Project Update

September 11, 2019 

Installation of the sidewalk bridge will begin the week of September 2 and continue the week of September 9.

Scope of Work

  • As in most Local Law 11 cases, work will be performed by contractors using swing scaffold to lower themselves down the side of the building.
  • Facade repairs will require the occasional grinding and removal of mortar and masonry. This work is done with small hand tools and will create some noise. A minimal amount of dust will be generated in the area immediately surrounding the work.
  • If any asbestos containing material, or ACM, is detected in the mastic that lies behind the brick facade, contractors will implement¬†safe abatement protocols to securely dispose of it.
  • Sidewalk bridging will be installed on Broadway and Lafayette Street around the perimeter of the building in September to protect pedestrian traffic.