New York University is performing standard Local Law 11 repairs to the facade of 29 Washington Place. The project is scheduled to begin in mid-May and continue through August. All work is weather and site condition permitting.

Work Hours

Monday - Friday
7:00 am - 4:00 pm

 

Current Project Update

May 15, 2020

Contractors are scheduled to begin installation of the sidewalk shed on Monday, May 18.

Scope of Work

  • As in most Local Law 11 cases, work will be performed by contractors using swing scaffold to lower themselves down the side of the building.
  • Facade repairs will require the occasional grinding and removal of mortar and masonry. This work is done with small hand tools and will create some noise. A minimal amount of dust will be generated in the area immediately surrounding the work.
  • If any asbestos containing material, or ACM, is detected in the mastic that lies behind the brick facade, contractors will implement safe abatement protocols to securely dispose of it.
  • Sidewalk bridging will be installed on Washington Place and Greene Street around the perimeter of the building to protect pedestrian traffic.
  • As with any active construction site, dust will be generated in the area immediately surrounding the work and noise will be generated by mechanical equipment and hand held tools.